Measure, scale and adjust

Did it work, how does it grow and what needs correcting?

Test and scale. Third measurement

Objective
Prove with evidence whether the pilot moved the expected indicator and margin, and decide whether to scale, adjust or close.
Time
MSME: 1-2 hours a month. Large company: a quarterly close of 1-2 weeks.

Purpose of the stage

The decision in this stage

Stage 5 left a pilot under way with a decision date. This stage answers whether the pilot worked, whether it makes sense to scale it and what the company can state publicly.

It is the third measurement on the route, made with the same H06 and the same evidence rule as the Stage 1 baseline, because without that comparison the pilot's result cannot support a decision.

Minimum to move forward: in an MSME, H06 with the 3-5 heaviest flows (N1, N2 and N3) and actual EBITDA against H02.

Step by step

Tasks and deliverables of each step

  1. 01Measure the period with the same H06Monthly in an MSME, quarterly in a large company. Copy the baseline file, record the period and ask for one document per flow.H06, a copy of the baseline file for each period. In the book: section 6.2
  2. 02Read the result against the baseline and the value caseRead N4 together with N8. Bring the actual mass and revenue into H02 and explain any EBITDA difference greater than 20%.H06, Results sheet. H02, Parameters and Project cash flow sheets. In the book: section 6.3
  3. 03Decide at the gate and reportApply the criteria in section 5.6, sign the minutes and report each figure with its indicator, boundary and verification.H11, milestones and dates. In a network, H05: status of each synergy. In the book: section 6.4

Tools

Templates to work on as you go

H06 Book and Playbook spreadsheet, N1-N8

Circular transition indicators, in tracking mode

It is the tool from section 1.5 in tracking mode.

  1. Copy the baseline file and name it with the period.
  2. Update masses, destinations, evidence and quality.
  3. In Results, enter the baseline.
  4. Bring the To value case sheet into H02.

Result Change in N1-N8, coverage with quality 2 or 3 and actual mass for H02.

In the book: section 6.2Playbook spreadsheet (in Spanish) with completed examplesGet the Book + Kit

H02 Book and Playbook spreadsheet, 60 min

Value case

Calculates revenue, savings, NPV, IRR and payback by submodel, with the example of a cocoa cooperative.

In the book: section 6.3Playbook spreadsheet (in Spanish) with a completed exampleGet the Book + KitFirst viability check in the kit

H05 Book, half-day workshop

Local synergy matrix

Matches supply and demand of by-products in an area and estimates value, distance and avoided emissions.

In the book: section 6.4Template and view in the book

By company size

How the work changes in an MSME and in a large company

MSME

  • 1-2 hours a month with invoices, shipping guides and certificates for 3-5 flows (N1-N3) and actual EBITDA against H02.
  • Gates on the H11 dates, with a report to whoever co-financed.

Large company

  • Quarterly close from the ERP, scales and waste handlers: N1-N8 and evidence above 80%.
  • Gate in the investment committee and verification by an independent third party before making public claims.

Common mistakes

  • Changing the boundary between periods. The apparent improvement comes from measuring fewer flows, not from recovering more.
  • Counting everything that goes to a third party as recovered. Without a certificate from the receiver, it counts as 0%.
  • Announcing decoupling with N4 while N8 rises. That is a rebound effect, and a verifier will spot it.
  • Adding potential tons to actual ones. In a network, each figure carries its status.
  • Leaving the pilot open with no gate. A pilot with no decision date uses up the team and never reaches the budget.

Deliverable

With real data in hand, the route starts again with the next opportunity

Deliverable

Measurement of the period in H06 against the baseline, with evidence coverage. Gate minutes (scale, adjust or close) signed by the target owner and finance, and approved by management. Report for the funder, buyer or regulator, with claims that state indicator, boundary and verification.

Closing the cycle

  • The boundary and formulas are the same as the baseline. If an estimated data point was verified, the baseline was recalculated and the change is disclosed.
  • Every flow reported as recovered has a document, and coverage is 80% or more.
  • N4 is reported together with N8, and any rebound is named.
  • Actual EBITDA was compared with H02 and the difference has a cause.
  • The gate applied the criteria in section 5.6 and has minutes, a decision and the date of the next review.
  • In a network, the portfolio separates what is identified, validated, piloted and in operation.