Stage 1

Diagnose the value chain

Where does your chain lose value and how much?

Measure and decide. First measurement

Objective
Measure the flows, losses and inefficiencies of the prioritized line and set the baseline against which the pilot will be measured.
Time
MSME: two workshops and one week of record keeping. Large company: 4-6 weeks.

Purpose of the stage

The decision in this stage

Stage 1 puts figures on what Stage 0 sensed and is the first of the three measurements on the route. It answers where value is lost, how much and with what evidence, and the five inefficiencies are read from that same measurement.

Without tons there is no value case and no way to know whether the pilot worked.

Minimum to move forward: on the MSME route, H06 at the starter level with N1, N2 and N3, a logbook for the 3-5 heaviest flows and, with that data, the reading of the five inefficiencies in H01 (template, step 1).

In the region

Two thirds of the region's waste is not even recorded. A plant that weighs its flows stands out to its buyer and its bank.

Step by step

Tasks and deliverables of each step

  1. 01Draw the chain and its flowsFrom supplier to end of life, mark where materials, water and energy come in, and where product, by-products, losses and waste go out. Bring the boundary from the kickoff charter into H06 and adjust it if the chain requires. Do it with the plant manager, on a one- to two-hour visit per area.H06, Profile sheet. Boundary. In the book: section 1.2
  2. 02Weigh and close the mass balanceRecord in tons per year the inputs that add up to at least 80% of the mass purchased and all outputs. Add or subtract inventory changes and convert everything to the same unit before comparing. Any difference between inputs and outputs is explained or investigated. Use invoices, shipping guides and scales.H06, Inputs and Outputs sheets. In the book: section 1.3
  3. 03Record the actual destination and its evidenceFor each output, note its actual destination and the document that proves it, following the table in section 1.4.H06, Outputs sheet, columns H-K. In the book: section 1.4
  4. 04Calculate the baselineComplete water and energy if they apply and the two indicators for your sector, then review the results. An MSME starts with N1, N2 and N3.H06, Water and energy, Sector and Results sheets. In the book: section 1.5
  5. 05Read the five inefficiencies in itBring into H01 the percentages you already measured in H06 and in your plant and sales records, rank the five inefficiencies by the tons or dollars behind them and note which data point was missing or which decision failed.H01, Records, Readings and List sheets. In the book: section 1.6
  6. 06Rate the data and carry the figures into the caseRate each data point from 1 to 3 with the scale in section 1.7 and carry the unrecovered tons into Stages 2 and 3. Ask finance to review them now, not once the value case already exists.H06, To value case sheet. In the book: section 1.7

Tools

Templates to work on as you go

H01 Book, Circular Transition Kit and Playbook spreadsheet, 45-60 min

Business model development: inefficiencies

Reads in the baseline the 14 indicators of the five inefficiencies, each with its figure and the document it comes from, and ranks the inefficiencies by the tons or dollars behind them. Eight readings come straight from H06.

  1. Bring into H01 the percentages you already measured in H06 and in your plant and sales records.
  2. Mark one of four levels according to the share that is already circular or recovered: up to 25%, up to half, up to 75% or more than 75%. After-sales and additional sales use cutoffs of 5, 10 and 25% of revenue.
  3. If a record is missing, that reading does not count and is flagged as data to obtain.
  4. Rank the five inefficiencies by tons or dollars. If you move one, write the criterion next to the list.
  5. Note which data point was missing or which decision failed.

Result A ranked list of the five inefficiencies. Those at the top are worked on first and count double when scoring the submodels in Stage 2.

In the book: section 1.6Playbook spreadsheet (in Spanish) with a completed exampleGet the Book + KitWork on it in the kit

H06 Book and Playbook spreadsheet, 1 day at the starter level

Circular transition indicators

Calculated in the Playbook spreadsheet. The file is version 3 of the workbook, with the formulas of the WBCSD's CTI v4.0, aligned with ISO 59020. It has two levels of use: starter, with N1, N2 and N3 to begin, and expansion, with all the indicators.

  1. In Profile, set the sector, measurement level and boundary.
  2. In Inputs, one row per input: mass and the share that is reused, recycled or certified renewable.
  3. In Outputs, one row per flow: actual destination, evidence and data quality.
  4. Complete Water and energy and the two indicators for your Sector.
  5. Review Results and copy the To value case sheet into H02.

Result N1-N6 and N8, coverage of quality data and the tons that feed the value case.

In the book: section 1.5Playbook spreadsheet (in Spanish) with completed examplesGet the Book + Kit

By company size

How the work changes in an MSME and in a large company

MSME

  • One workshop to draw the chain, one week recording the 3-5 heaviest flows and a second workshop to read the five inefficiencies in that data with H01.
  • If the data does not exist, record keeping takes about 3 more weeks and the route takes 9-11 weeks instead of 6-8.
  • Add the public self-assessment and H06 at the starter level with N1, N2 and N3, plus certificates from the waste handler or the recyclers so nothing counts as 0%.

Large company

  • 4-6 weeks with data from the management system (ERP), the scales and the waste handlers.
  • Stage 2 can begin once the baseline has its main flows.
  • Measure every flow, with reused and recycled kept separate, and N8 from the start.
  • Require quality level 3 in everything reported externally, and ask MSME suppliers for their own starter baseline.

Common mistakes

  • Measuring only waste. Without inputs there is no balance, no N1 and no N8.
  • Counting what the waste handler takes without a certificate. Without evidence, it counts as 0%.
  • Counting energy recovery as circular. It is energy recovery, outside the material cycle.
  • Asking for data in an audit tone. Fear of showing losses hides flows. Explain what each figure is used for.

Deliverable

When the stage closes, every ton lost has a figure, a destination and evidence

Deliverable

Baseline of the prioritized line: chain map with its boundary, closed mass balance, ranked inefficiency sheet with its stated criterion, applicable N1-N8 indicators, quality of each data point and unrecovered tons ready for Stage 2.

To move on to stage 2

  • Inputs and outputs balance, or the difference is explained.
  • Recorded inputs add up to at least 80% of the mass purchased.
  • Every output has an actual destination and evidence, or counts as 0%.
  • The five inefficiencies were read in H06 and in your records, and H01 ranks them by tons or dollars, with the criterion written if you changed the order.
  • H06 shows N1, N2 and N3, and N8 for a large company.
  • At least 80% of the mass has quality 2 or 3 data, or the results say “estimate”.
  • Finance reviewed the tons and the disposal costs.

Circular Transition Kit

Find your company’s circular opportunities

A team of AI agents that works for you in Claude.

Free access

Contact

Let’s talk about your company

Schedule a conversation