Illustrative case, construction, MSME

Concrete block maker, East Lima

An East Lima block maker charges to receive construction debris, but at prudent prices the case does not pay for itself.

Not viable under these assumptions

USD −44 K
NPV with equity
−11.9%
IRR
+5 years
Payback

Capital scenarios

The capital that makes it viable

ScenarioNPVIRRVerdict
EquityUSD −44 K−11.9%Not viable
GrantUSD −13 Kn/aNot viable
Impact loanUSD −33 Kn/aNot viable
NPV, thousands of USDIRRRate 20%−44 K−13 K−33 K

Assumptions and detail

Company and operation
Country
Peru, East Lima
Size
MSME with 12 workers and sales of about USD 560,000
Production
4,000 m³ of blocks and pavers a year, about 8,400 t
Flow
4,000 t of clean construction debris a year from year 3

Case built with the Playbook tools from public data for the region. It does not represent a real company.

Calculation assumptions

USD, 20% rate, 5 years, Peru income tax of 29.5%. Payback with equity: +5 years. Impact loan for 70% of the project, at 7.5% a year in USD, over a 5-year period with a 6-month grace period, assessed with the adjusted NPV.

Other scenarios

Commercial loan at 24%: adjusted NPV USD −49 K, IRR n/a, minimum debt service coverage −0.35. Not viable.

Path through the stages
  1. Prepare

    Owner and plant manager. Pressure: aggregate prices

  2. Diagnose the value chain

    100% virgin aggregate. Neighboring debris goes to the dump

  3. Choose opportunities

    1.2 replace aggregate and 5.1 gate fee with contractors, in a network (IE)

  4. Build the value case

    Not viable with equity or with a loan

  5. Measure gaps

    EO-RS registration, testing and finance

  6. Plan and pilot

    Pilot that tests the gate fee before buying equipment

  7. Measure, scale and adjust

    N1 from 0% to 36%. N8 falls 28%

Submodels applied

Rerun the calculation with your own figures

Spreadsheets H02 and H06, used to build the case, come with the Kit. In Spanish.