Illustrative case, construction, MSME
Concrete block maker, East Lima
An East Lima block maker charges to receive construction debris, but at prudent prices the case does not pay for itself.
Not viable under these assumptions
- USD −44 K
- NPV with equity
- −11.9%
- IRR
- +5 years
- Payback
Capital scenarios
The capital that makes it viable
Assumptions and detail
Company and operation
- Country
- Peru, East Lima
- Size
- MSME with 12 workers and sales of about USD 560,000
- Production
- 4,000 m³ of blocks and pavers a year, about 8,400 t
- Flow
- 4,000 t of clean construction debris a year from year 3
Case built with the Playbook tools from public data for the region. It does not represent a real company.
Calculation assumptions
USD, 20% rate, 5 years, Peru income tax of 29.5%. Payback with equity: +5 years. Impact loan for 70% of the project, at 7.5% a year in USD, over a 5-year period with a 6-month grace period, assessed with the adjusted NPV.
Other scenarios
Commercial loan at 24%: adjusted NPV USD −49 K, IRR n/a, minimum debt service coverage −0.35. Not viable.
Path through the stages
- Prepare
Owner and plant manager. Pressure: aggregate prices
- Diagnose the value chain
100% virgin aggregate. Neighboring debris goes to the dump
- Choose opportunities
1.2 replace aggregate and 5.1 gate fee with contractors, in a network (IE)
- Build the value case
Not viable with equity or with a loan
- Measure gaps
EO-RS registration, testing and finance
- Plan and pilot
Pilot that tests the gate fee before buying equipment
- Measure, scale and adjust
N1 from 0% to 36%. N8 falls 28%
Rerun the calculation with your own figures
Spreadsheets H02 and H06, used to build the case, come with the Kit. In Spanish.