PlaybookBusiness modelsTools
Cases
ServicesCertificationFor organizations
ResourcesState of the regionCountry dataFundingFrequently asked questions
Team
Español
Free AI Kit
Resources

Glossary

A common language for circularity

A

Actual recovery

Percentage of a flow that is actually reused, recycled or returned to the biological cycle. Without documentary evidence, it counts as 0%.

Adjusted NPV

Measures what the loan adds to or takes from the project. It is the project’s NPV plus the value of the financing: the money you receive from the loan, minus each payment, plus the tax you save on interest.

Everything is brought to today at the rate a commercial bank would charge a company of your size (section 3.5). In H02, that reference rate in USD is 19% for an MSME, 7.3% for a medium-sized company and 6.9% for a large company.

AI prerequisite rule

In H04, if your waste data is below level 2, AI is blocked and the first step is to measure (section 4.4).

Anchor company

A large company whose purchasing or waste volume makes a synergy network viable and brings its MSME suppliers along.

B

Baseline

Starting measurement of material flows, scrap and the N1 to N8 indicators that apply. It is the point against which pilot results are compared.

Biological cycle

Flow of renewable materials, such as food, fibers, wood or fish, that after being used in cascade return safely to the biosphere.

Boundary of the measured system

What goes into the measurement: which plants, processes, flows and period you count. It must stay the same every year so the figures can be compared.

Break-even price

The price at which the project’s NPV is zero.

C

Canvas

Ten-block canvas (tool H07) where you summarize the opportunity. Each stage fills in its own blocks.

Capability C8

Orchestrating ecosystems and local synergies. It is the capability to bring together the companies of a region and take them all the way to a contract.

It is a priority in the region, because an MSME rarely fills a plant or a contract on its own. When exercised on behalf of several companies, it is regional coordination.

Capital stack

The mix of sources that pays for the investment, tranche by tranche: own cash, customer, supplier, debt, guarantee or fund. Tool H10 builds it (section 4.6).

Circular business model

The logic by which a company creates and captures value by keeping products and materials in use. This Playbook works with five: circular inputs, sharing platforms, product as a service, product life extension and resource recovery.

Circular economy

A system that eliminates waste and pollution by design, keeps products and materials in use at their highest value and regenerates nature.

Circular inflow

Reused, recycled or renewable input of verified sustainable origin, as a percentage of the total mass of inflows (N1).

Circular outflow

Recovery potential by design multiplied by actual recovery, as a percentage of the total mass of outflows (N2).

Circular professional competencies

What a person needs to know and do to lead the transition, in five domains: thinking in systems, designing the business, making it pay, operating and measuring, and connecting and transforming.

Circularity strategies

Narrow (use less), slow (use longer), cycle (use the material again) and regenerate (restore natural systems).

CITE

Technology innovation and transfer center: a public or private entity in Peru that provides technical services to the companies of a sector.

Co-product

Material that comes out of a process along with the main product and may have its own market value.

Confirming

The buyer’s bank pays its suppliers in advance for invoices the buyer has already approved.

Core indicators (N1 to N8)
  • N1 Circular inflow. Percentage of the inflow mass that is reused, recycled or certified renewable.
  • N2 Circular outflow. Percentage of the outflow mass that is recovered, by design and in practice.
  • N3 Material circularity. N1 and N2 weighted by mass.
  • N4 Circular material productivity. Revenue per ton of linear inflow.
  • N5 Circular water. Circular sources and discharges, and the number of times each cubic meter is used.
  • N6 Renewable energy. Renewable energy over the total.
  • N7 Avoided GHG. Avoided emissions, in tCO₂e per year, separate from the inventory.
  • N8 Virgin material consumed. Tons of virgin material per year, in absolute terms.
Cost of capital or discount rate

Minimum return the owner of the capital requires. Future flows are brought to today’s value at that rate. This book uses 20% for an MSME, 13% for a medium-sized company and 10% for a large company (section 3.2).

Cost of debt

The loan rate. It is not the discount rate: one measures what the owner requires and the other what the bank charges.

Coverage

Percentage of the mass whose data has quality 2 or 3. Below 80%, present the result as an estimate (section 1.7).

CTI and GCP

The Circular Transition Indicators (CTI) of the World Business Council for Sustainable Development (WBCSD, v4.0, 2023) measure in tons what enters and leaves a company. The Global Circularity Protocol (GCP) v1.0 (2025) succeeds them with the same core formulas.

D

Data quality

A 1-3 scale based on what backs the data: 1 is an estimate with no document, 2 is an internal document and 3 is a third-party document.

Dematerialization

Delivering the same function with less material per unit of service. It is the narrowing strategy and is verified in absolute tons.

Digital product passport

Digital record of composition, origin, repairability and recyclability that European ecodesign regulation is phasing in as a requirement.

Discount rate

See Cost of capital or discount rate.

DSCR

Debt service coverage ratio: how many times the year’s cash covers the loan payment. Banks usually require 1.2 or more. It is calculated as cash available for debt divided by the loan payment. That cash deducts any investment not funded by a loan or a committed contribution. Below 1.2, banks usually reject the loan.

E

EBITDA

Operating profit before interest, taxes, depreciation and amortization. It measures the operating cash the business generates before paying for its financing.

EPR

Extended producer responsibility: whoever puts products on the market finances and organizes their collection and recovery.

EUDR

EU regulation on deforestation-free products. It requires geographic traceability for cocoa, coffee, palm oil, soy, cattle, rubber and wood.

F

Factoring

Advance on receivables: a financial institution pays the invoice today, at a discount, and collects from the customer later.

Financial filter

The rule in section 3.6 for seeking capital: NPV or adjusted NPV of zero or more in some scenario, a DSCR of 1.2 with debt and payback within the term. Always show the NPV without residual value, the adverse DSCR and where the NPV comes from.

Free loan for use (comodato)

Free loan of an asset, such as equipment or a container, that is returned at the end of the term.

G

Gap

Difference between what the opportunity requires, in competencies and capabilities, and what your company has today.

Gate

Decision point of the pilot, and only of the pilot. There are two: P1, at the end of month 3, and P2, in month 12 for an MSME and month 9 for a large company.

At each one, and at the decision in section 6.4, the pilot is scaled, adjusted or closed according to criteria written in advance (section 5.6). Not to be confused with the financial filter or the AI prerequisite rule.

Gate record

Signed record of the decision to scale, adjust or close the pilot, with its criterion and the date of the next review (Stage 6).

Grace period

Months at the start of a loan when no principal is paid, or only interest. It helps if it covers the ramp-up, when the plant does not yet generate cash.

Grassroots waste pickers

People and organizations that collect, sort and sell recyclables, often informally. They supply up to half of what is recycled in the region.

Green taxonomy

Official classification of the economic activities considered environmentally sustainable for financing purposes.

Guide case

Each of the three cases that run through the method: the cocoa cooperative, the canning plant and the northern coast corridor.

I

Industrial symbiosis

Collective approach in which separate companies exchange materials, water, energy or by-products, with an advantage from proximity. This Playbook treats it as a layer and a capability, not as a model.

Inefficiency

Loss of value in the linear chain, measured with the 14 indicators that H01 reads in the baseline.

Internal incentives

Rules that make waste the rational choice: cheap landfill, volume bonuses, subsidies for virgin material, EPR without eco-modulation or purchasing at the lowest price.

IRR

Internal rate of return: the discount rate at which the project’s NPV would be zero. It tells you up to what cost of capital the project still pays for itself.

ISO 59020

A 2024 standard for measuring and assessing the circular performance of a region, a company network, an organization or a product. Its results are verified by an independent third party.

J

Just transition

Ensuring circularity shares benefits and costs fairly: decent work, inclusion of waste pickers, zero child labor, a gender focus and respect for communities.

K

Kickoff charter

Stage 0 deliverable, signed by management: owner, team with hours, scope, main pressure, internal incentives, first cultural reading and diagnostic budget.

L

Local synergies

A layer that any model can apply in a network: inter-company exchange, shared infrastructure or regional coordination. Each company earns through its own submodel.

M

Mass balance

Reconciliation of what enters, leaves and stays in a plant, in the same unit. Add or subtract the change in inventory before comparing.

Material and energy recovery

Material recovery returns the resource as raw material. Energy recovery burns it to obtain energy: it sits outside the loop and does not count as material circularity (section 2.3).

MSME (MYPE)

Micro and small enterprise. In other countries of the region it is grouped with medium-sized companies as mipyme. It includes cooperatives and producer associations of equivalent size.

N

Networked

Marker of the “Local synergies” layer. It shows that a submodel operates together with other companies in the area, in one of three configurations: inter-company exchange (IE), shared infrastructure (IC) or regional coordination (OT). The company keeps its submodel and operates alongside others.

NPV

Net present value: the sum of future cash flows brought to today’s value at the discount rate, minus the investment. If it is positive, the project pays for its capital. If it is negative, it does not.

O

Open loop and downcycling

The recovered material goes into a less demanding product and leaves its loop: bottle to fiber, offcut to filling, rubble to sub-base. It is reported separately from the closed loop.

Opportunity (per round)

Each round of Stage 2 produces one opportunity. It can group several submodels on the same flow or the same investment, as in the cocoa case, with compost and husk flour from the same husk and pulp. The rest of the shortlist waits for the next round, when Stage 6 loops back to Stage 2.

P

Payback

Years it takes the project’s cash to return the investment.

Phase

Applies only to the pilot. Phase I: prototype and unpaid pilot (Stage 5). Phase II: pilot with a paying customer (Stages 5 and 6). Phase III: scale (Stage 6). The criteria for moving from one phase to the next are in section 5.6.

Pilot indicator and annual indicator

The pilot indicator is measured over the short pilot period. The annual indicator is measured over a rolling year. If an estimated figure is verified or the evidence changes, the baseline is recalculated and the change is disclosed (section 6.2).

Q

Quasi-equity

Financing between debt and equity, such as subordinated or convertible debt. It is repaid after the loans and sometimes based on results.

R

RACI

Matrix that says who does the work (R), who approves it (A), who is consulted (C) and who is informed (I) at each stage (section II.3).

Ramp-up

Stage in which the operation climbs to full capacity. The risk is technical, and it is best to have no loan payments during it.

Rebound effect

Circular savings that do not reduce virgin material consumption. It shows when N4 rises and N8, virgin material consumed, rises too.

Physical limits: material degrades with each cycle and no recycling reaches 100%. Blends and additives make recovery harder, and recovery also uses energy and logistics.

System limits: efficiency lowers costs and raises consumption, and what is reused does not always displace new production. Demand grows and extraction can move to another country. See section 6.3.

Recovery potential

Share of a flow that can be recovered by design. N2 multiplies it by actual recovery.

Regenerative business

Companies that leave natural and social systems better than before. The gradient runs from reducing impact (efficiency) to circular (closing loops) to regenerative. A circular company is not necessarily regenerative.

Regional coordination

Networked configuration in which a third party, such as an industrial park manager, a trade association or a municipality, coordinates the synergies of a region. It is capability C8 exercised on behalf of several companies, and it does not add a submodel.

Relative and absolute decoupling

It is relative when revenue grows faster than the virgin material consumed. It is absolute only when virgin material falls while revenue grows. If N4 and N8 rise together, you can only claim relative decoupling (section 6.3).

Residual value

What the equipment and working capital are worth at the end of the horizon. If it accounts for more than half of the NPV, H02 warns you. If the asset passes to the customer or is written off, use the transfer price at closing, which may be zero.

Rolling year

The last 12 months, recalculated every month. It keeps seasonality from distorting the annual indicator.

S

Stage and step

A stage is each of the seven (0 to 6) in the method, with its decision and deliverable. A step is an action within the stage. Stages 0 to 5 make up the “Measure and decide” block and Stages 5 and 6 the “Test and scale” block.

Submodel

A specific way to apply a circular business model. This Playbook organizes 17 submodels in 5 models, with the same code across all tools. Each one has its profile in Annex A, including the biological cascade (5.4) and regenerative production (1.3).

T

Technical cycle

Flow of non-renewable materials, such as metals, plastics and minerals, that are kept in use by sharing, repairing, remanufacturing and recycling.

Toll processing (maquila)

A contract in which one company processes another’s material for a fee, without buying it.

Tool codes (H01 to H12)
  • H01 Business model development. Reads the five inefficiencies in the baseline and prioritizes submodels (Stages 1 and 2).
  • H02 Value case. Calculates cash flow and tests it with three ways to finance it (Stages 3 and 6).
  • H03 Capability maturity. Rates the nine capabilities, C1 to C9 (Stage 4).
  • H04 Technology and AI maturity. Places your level in data and AI and the candidate technologies (Stage 4).
  • H05 Local synergy matrix. Matches supply and demand of flows between companies (Stages 2 and 6).
  • H06 Circular transition indicators. Calculates the baseline and its follow-up, N1 to N8 (Stages 1 and 6).
  • H07 Circular business model canvas. Summarizes the opportunity in ten blocks (Stage 2).
  • H08 Cultural gap analysis. Reads values, mindsets and behaviors by function (Stages 0 and 4).
  • H09 Ecosystem partner identification. Names who covers each gap, with the 14 roles (Stage 4).
  • H10 Financing requirements. Builds the capital stack by tranche, source and funder (Stage 4).
  • H11 Transformation roadmap. Orders activities, owners, phases and gates (Stages 5 and 6).
  • H12 Competency self-assessment. Measures the 15 competencies of the person who leads (Stage 4).

U

UIT

Peru’s Tax Unit (Unidad Impositiva Tributaria): a reference value set by the government for taxes, fines and legal thresholds.

V

Value case

Analysis that answers whether a circular opportunity pays for itself and with what financing. It brings together revenue, savings, investment and cash flow in tool H02, and is reviewed with finance.

Value retention hierarchy

From the inner loop to the outer one: rethink and reduce, share, maintain, reuse, remanufacture, recycle, biological cascade, energy recovery and disposal. Rule: prefer the innermost loop.

Get the Book + Kit