
Illustrative case, packaging and plastics, MSME
Waste picker organization, Bogotá
A Bogotá waste picker organization looks at selling cold-washed flake and finds the price falls short.
Not viable under these assumptions
- USD −528 K
- NPV with equity
- n/a
- IRR
- +5 years
- Payback
Capital scenarios
The capital that makes it viable
Assumptions and detail
Company and operation
- Company
- Organization of professional waste pickers in southern Bogotá, in the process of formalization, with 80 waste pickers
- Operation
- A sorting station (ECA) handling 300 t a month: 3,600 t a year of recovered and invoiced material
- Flow
- 476 t a year of its own PET, plus bottles from three or four allied organizations
Case built with the Playbook tools from public data for the region. It does not represent a real company.
Calculation assumptions
USD, 20% rate, 5 years, Colombia income tax of 35%. Payback with equity: +5 years. Impact loan for 70% of the project, at 7.5% a year in USD, over a 5-year period with a 6-month grace period, assessed with the adjusted NPV. The grant is modeled as taxable: in Colombia it counts as income unless the project is qualified by the CNBT before receiving it.
Other scenarios
Commercial loan at 24%: adjusted NPV USD −546 K, IRR n/a, minimum debt service coverage −2.30. Not viable.
Path through the stages
- Prepare
The assembly signs a 90-day project charter with the manager. Pressure: Decree 1381 of 2024 and EPR targets.
- Diagnose the value chain
The material already circulates. The value does not: 476 t of PET go loose to intermediaries.
- Choose opportunities
Cold-washed flake (5.1) under contract, in a network (IE), compared with sorted bales under contract.
- Build the value case
Not viable with equity or with a grant. Only a price of USD 1,135 per t changes that.
- Measure gaps
Running a plant and selling under contract, two new trades.
- Plan and pilot
Three months of toll processing and a price milestone before buying the line.
- Measure, scale and adjust
If the line is installed, 78% of the processed PET leaves as flake. N1 to N3 barely change.
Submodels applied
Rerun the calculation with your own figures
Spreadsheets H02 and H06, used to build the case, come with the Kit. In Spanish.