
Sector profile
Construction
Construction produces the heaviest waste in the region and the least measured. It also has an anchor in the cement plant, which can take other industries’ discards as raw material. This profile shows how to turn debris into aggregate and the building site into a client for circular materials.
Core message
Construction debris is the flow with the most mass and the least data, and a recycling target turns it into a market
What is not weighed is not sold
Lima generates about 19,000 t of construction debris a day and close to 70% ends up in the sea or in rivers (Capeco, 2017). Weighing construction and demolition waste by site is the first step to meeting a target and to selling it.
The target creates the market
Bogotá recovered 2.53 Mt of construction and demolition waste in 2025 because Resolution 1257 binds large generators: the target is 50% from 2026 and rises to 75% in 2030. Peru regulates how this waste is handled, but sets no recycled content.
Share and reuse before crushing
Idle equipment and site surplus retain more value than aggregate. Construction waste used in base and subbase layers is an open loop.
Burning in the kiln is energy recovery
Co-processing waste as fuel is energy recovery, outside the loop. Slag or tailings used as raw material are a material exchange.
Sector data
Where value is lost and who moves the sector
- Main submodels
- 1.1 Durable and modular design, 1.2 Circular inputs and renewable energy, 2.1 Sharing assets and capacity, 4.3 Resell, 5.2 Return and sale of production waste, Networked
- Supporting submodels
- 3.1 Product as a service by subscription, 5.6 Circular water
- Construction MSMEs and contractors
- Shared equipment and the 90-day pilot
- Builders and developers
- Submodels, regulation and measurement
- Cement and building materials producers
- Opportunity 2 and synergies
- Trade associations, municipalities and public procurement
- Stakeholder map and roadmaps
Cases